top of page

This project involved repairing badly deteriorated basement bathroom and updating the  main level bathroom in a 1940’s built home

 

  • Removal/rebuilding of walls, ceiling, and floor framing

  • Upgrading of water,waste, and electrical systems

  • Repairs to closet

  • Custom design and construction of a 40in wide Vanity

  • A wall inset medicine cabinet

  • Toilets, tubs, surrounds, cushion vinyl flooring, GFI receptacles, dtowel and pater racks, exhaust fans, trim and paint

 

dualBasement_00before

Basement Before

dualBasement_00after

Basement After

dualBasement_01before

Basement Before

dualBasement_01beforeb

Basement Before

dualBasement_01after

Basement After

dualMain_02before

Main Floor Before

dualMain_02after

Main Floor After

dualMain_04before

Main Floor Before

dualMain_04after

Main Floor After

dualMain_08before

Main Floor BeFore

dualMain_08after

Main Floor After

dualMain_10before

Main Floor Before

dualMain_10after

Main Floor After

dualMain_12before

Main Floor Before

dualMain_12after

Main Floor After

dualMain_06after

Cabinet Build

© 2016. Proudly created with Wix.com

bottom of page